Design-Build

We were the contractor for the first ever GDOT design-build bridge project in the Atlanta metropolitan area, the 5th Street Pedestrian Plaza Bridge. This signature bridge with expansive greenspace at Georgia Tech spans 15 lanes of the I-75/I-85 Downtown Connector. Another design-build project is the I-85 interchange at the Kia Motors Manufacturing Plant at West Point, Georgia. This project incorporated precast substructure elements, bridge columns, caps and beams, to speed up construction time. You can view the project video below. These are just two of the many design-build projects we have successfully completed. Georgia Bridge and Concrete has that special blend of knowledge and experience required to bring together a great team to design, build and execute the overall project for our client.